Normally as the caboose went down the rail the wheel driven generator would recharge the batteries or the caboose was plugged into site 12 volt power. The caboose never had air conditioning. Phase 1 Project Description: Install 240 volt 3 phase electrical connectors on each end of caboose for trainline connection.