Larger batteries typical of BEBs (250 – 660 kWh) require long charging time at low power. There are a number of faster (up to 350 kW) plug-in charging solutions available for transit vehicles. Faster still plug-in charging options are under development, with a 1 MW standard introduced in summer 2022.