The project began in 2013 with the excavation of two vertical shafts in Newburgh and Wappinger to gain access to the subsurface. These shafts, 845 and 675 feet deep respectively, were completed in 2016. A massive tunnel boring machine completed excavation of the tunnel on Aug.