He said work crews placed more than 8,200 loads of fill dirt, 2,400 loads of rock and more than 4,000 tons of asphalt in making the repairs. An 11 a.m. opening of the rebuilt causeway that links the island and the mainland was announced by Gov. Ron DeSantis at a briefing at the base of the first bridge segment.