Loading Page...

How long did Boston tunnel take?

Planning began in 1982; the construction work was carried out between 1991 and 2006; and the project concluded on December 31, 2007, when the partnership between the program manager and the Massachusetts Turnpike Authority ended.



People Also Ask

WASHINGTON, July 10 — The ceiling collapsed in one of Boston's Big Dig tunnels a year ago, killing one woman, because builders used the wrong epoxy to hold the anchor bolts in place, the National Transportation Safety Board said Tuesday.

MORE DETAILS

The National Transportation Safety Board determines that the probable cause of the July 10, 2006, ceiling collapse in the D Street portal of the Interstate 90 connector tunnel in Boston, Massachusetts, was the use of an epoxy anchor adhesive with poor creep resistance, that is, an epoxy formulation that was not capable ...

MORE DETAILS

The Sumner Tunnel was opened on June 30, 1934. It carried traffic in both directions until the opening of the parallel Callahan Tunnel in 1961. The Sumner Tunnel is named for William H. Sumner, the son of Governor Increase Sumner.

MORE DETAILS

Built in the 1930s, the Sumner Tunnel (Route 1A South) is the first traffic tunnel in Massachusetts and takes vehicles from Logan Airport to Boston/I-93.

MORE DETAILS

The tunnel is 8,448 feet (2,575 m) long, of which approximately 3,960 feet (1,210 m) are underwater. A toll is collected in both directions, through the E-ZPass electronic toll collection system, formerly named the Fast Lane system.

MORE DETAILS

Opened to traffic June 30, 1934. It was originally a two-way road that carried traffic in both directions, until the opening of the parallel Callahan Tunnel in 1961. The tunnel is 8,448 feet long, of which approximately 3,960 feet are underwater.

MORE DETAILS