High Speed 2 (HS2) is a planned high-speed railway line in England, the first phase of which is under construction in stages and due for completion between 2029 and 2033, depending on approval for later stages.
People Also Ask
HS2 will be delayed by another two years and major roadbuilding schemes will be mothballed, ministers have confirmed, after soaring inflation added billions to the cost of transport infrastructure projects.
The government says HS2 will cut the time for this journey to 49 minutes, making it 30 minutes faster than now. Importantly, the line will start at Euston, in central London, rather than a new station to the west of the capital as some had speculated in recent weeks.
When operational, HS2 will generate sound. This will be both through the movement of trains along the line and from the equipment along the route needed to operate our trains.
The rolling stock will run at a maximum speed of 360 km/h (225 mph) and will operate on both HS2 track and existing conventional track. The proposed network has been reduced substantially since it was announced in 2013. The line would originally have formed a 'Y' shape, branching north of Birmingham Interchange.
HS2 will free up capacity on the existing lines, enabling more local commuter services and more freight services – more freight trains will help take lorries off the road and provide environmental benefits. The project has had a negative effect on economic, social and environmental factors.
We are already committed to using zero carbon electricity to power HS2 trains, which will be some of the quietest and fastest in the world. Reliable, long-distance train travel between the North, the Midlands and the South East will be emission-free.
HS2 currently has five TBMs in the ground, with a further five due to be launched over the coming years. Together they will create 64 miles (103 kilometres) of tunnel between London and the West Midlands including major tunnels on the approaches to London and Birmingham.
High Speed Two (HS2) Limited is the company responsible for developing and promoting the UK's new high speed rail network. It is funded by grant-in-aid from the government. HS2 Ltd is an executive non-departmental public body, sponsored by the Department for Transport.
HS2 passengers will travel in the first driverless trains on a British cross-country mainline under specifications given to manufacturers by ministers, The Telegraph can disclose.
HS2 is not just about speed or getting to London more quickly, it is about bringing the Northern Powerhouse closer to the great cities of the Midlands. It will create more capacity for local services, the same way Northern Powerhouse Rail does for freight and local passengers across the Pennines.
What is the route for HS2? The new railway line running between London and the West Midlands would carry 400m-long (1,300ft) trains with as many as 1,100 seats per train, reaching speeds of up to 250mph and would run as often as 14 times an hour in each direction.