Total 12.15 Comparing the data in Tables 2 & 3 shows that for the at- grade construction, maglev would cost at least 3.8 $M/ mi more than the TGV Atlantic. The cost difference may be significantly higher when actual costs are substituted for the maglev tchnology costs.