26 May 2023Structural and Technical Issues Most heavily damaged were the crew areas on lower decks (0 to 4), as result of a significant flooding (crew cabins and corridors), while Crew Bar Lounge's walls and ceilings were destroyed. By ~8 pm (midnight) all public areas were closed off and evacuated.