It should be mentioned that when it is finished, in 2029, the Fehmarnbelt Tunnel will be the longest combined rail and road tunnel ever built. The Fehmarnbelt Fixed Link, as the tunnel is formally known, will include two double-lane highways and two electrified rail tracks.