The preferred route provides a new dual carriageway running to the north of the existing A30 between Chiverton and Chybucca and to the south between Chybucca and Carland Cross. It includes: a 70mph high quality dual carriageway. a new roundabout at Chiverton Cross built on 2 levels to allow traffic to flow freely.