A drilling rig has been set up at the 3rd Avenue North beach end that will drill the pipe carrier holes from land to 1,000 feet into the Gulf of Mexico to allow the pipes to be installed. At the 3rd Avenue North Beach there exists a few bits of exposed piping already there.