Loading Page...

Where is the big dig in Boston?

The Central Artery/Tunnel Project (CA/T Project), commonly known as the Big Dig, was a megaproject in Boston that rerouted the Central Artery of Interstate 93 (I-93), the chief highway through the heart of the city, into the 1.5-mile (2.4 km) Thomas P. O'Neill Jr. Tunnel.



People Also Ask

The Sumner Tunnel was opened on June 30, 1934. It carried traffic in both directions until the opening of the parallel Callahan Tunnel in 1961. The Sumner Tunnel is named for William H. Sumner, the son of Governor Increase Sumner.

MORE DETAILS

The deepest point of the underground highway is 120. That's beneath the Red Line subway tunnel at Dewey Square (Atlantic Avenue and Summer Street). The highest point is at State Street, where the highway passes over the Blue Line subway tunnel and the roof of the highway is the street above.

MORE DETAILS

WASHINGTON, July 10 — The ceiling collapsed in one of Boston's Big Dig tunnels a year ago, killing one woman, because builders used the wrong epoxy to hold the anchor bolts in place, the National Transportation Safety Board said Tuesday.

MORE DETAILS

It was originally a two-way road that carried traffic in both directions, until the opening of the parallel Callahan Tunnel in 1961. The tunnel is 8,448 feet long, of which approximately 3,960 feet are underwater. In 2017, the state removed the tollbooths as part of a switch to electronic tolling.

MORE DETAILS

The tunnel is 8,448 feet (2,575 m) long, of which approximately 3,960 feet (1,210 m) are underwater. A toll is collected in both directions, through the E-ZPass electronic toll collection system, formerly named the Fast Lane system.

MORE DETAILS

The four tunnels vary in age between 19 years old and 88 years old. Both the Ted Williams Tunnel, which opened in 1995, and the Thomas O'Neill Tunnel, which opened in 2003, were part of the historic Big Dig project.

MORE DETAILS

Opened to traffic June 30, 1934. It was originally a two-way road that carried traffic in both directions, until the opening of the parallel Callahan Tunnel in 1961. The tunnel is 8,448 feet long, of which approximately 3,960 feet are underwater.

MORE DETAILS

The Seikan Tunnel (Japanese: ??????, Seikan Tonneru or ????, Seikan Zuido) is a 53.85 km (33.46 mi) dual-gauge railway tunnel in Japan, with a 23.3 km (14.5 mi) portion under the seabed of the Tsugaru Strait, which separates Aomori Prefecture on the main Japanese island of Honshu from the northern island of Hokkaido.

MORE DETAILS

Perhaps ironically, the Blue Line takes several points of pride from its proximity to water, which gives it its name. Local historians claim the tunnel that runs under the harbor as the first underwater subway tunnel in the United States.

MORE DETAILS