Reconstruction in Lake Havasu The reconstruction took slightly over three years and was completed in late 1971 by Sundt Construction. The bridge was not rebuilt over a river, but was put up on land between the main part of the city and Pittsburgh Point, which at that time was a peninsula jutting into Lake Havasu.