Loading Page...

Who went to jail for the Big Dig?

Aggregate provided 60% of the concrete used to build the Big Dig. Indicted were: former general manager Robert Prosperi; dispatch manager Marc Blais; dispatch manager John Farrar; quality control manager McNally; district operations manager Gregory Stevenson; and dispatch manager Keith Thomas.



People Also Ask

The Big Dig was the most expensive highway project in the United States, and was plagued by cost overruns, delays, leaks, design flaws, charges of poor execution and use of substandard materials, criminal charges and arrests, and the death of one motorist.

MORE DETAILS

However, the project was completed in December 2007 at a cost of over $8.08 billion (in 1982 dollars, $21.5 billion adjusted for inflation, meaning a cost overrun of about 190%) as of 2020.

MORE DETAILS

The Boston's Big Dig project replaced the elevated deteriorating six-lane elevated Central Artery (I-93) with an underground expressway beneath the existing road, extended the I-90 tollway underground to the South Boston Seaport and Logan International Airport, built a new 10-lane bridge over the Charles River, and ...

MORE DETAILS

Planning began in 1982; the construction work was carried out between 1991 and 2006; and the project concluded on December 31, 2007, when the partnership between the program manager and the Massachusetts Turnpike Authority ended.

MORE DETAILS

Perhaps ironically, the Blue Line takes several points of pride from its proximity to water, which gives it its name. Local historians claim the tunnel that runs under the harbor as the first underwater subway tunnel in the United States.