The first phase of the line, consisting of the 96th Street, 86th Street and 72nd Street stations, as well as 1.8 mi (2.9 km) of tunnel, cost $4.45 billion. A 1.5-mile (2.4 km), $6 billion second phase from 96th to 125th Streets is in planning as of 2023.