Why is California High-Speed Rail so expensive?

Inflation and higher construction costs have contributed to the high price tag. The project has spent $9.8 billion so far, according to Brian Kelly, CEO of the California High-Speed Rail Authority. We knew we've had a funding gap ever since the project started, Kelly said.



People Also Ask

According to a study by the Los Angeles Times, the most current projected fare for the train, $86 a ride, would still be one of the most inexpensive high-speed rail trips on a per-mile basis. When funding for the project was first approved, however, tickets were projected to be closer to the $50 range.

MORE DETAILS

This chart displays the Breakeven Analysis on Phase 1 of the high-speed rail system assuming the horizon year of 2040, showing a 99.4 percent probability that Phase 1 would be profitable between $0 to $5.7 billion and a 0.6 percent chance of deficit between $220 million and 0.

MORE DETAILS

Funding for California high-speed rail has come from the legislative appropriation of state special funds and from federal competitive grants.

MORE DETAILS

The interstate highway system cost $129 billion — roughly $290 billion in current dollars — and took 35 years to complete, running from 1957 to 1992. The $1.2 trillion infrastructure bill enacted in 2021 has $102 billion for rail, but none of the money is set aside for high-speed rail.

MORE DETAILS

With one possible exception, no high-speed rail system in this country could pay for itself, and the claimed external benefits - cleaner air, energy saved, eased pressure on airports - are nonexistent.

MORE DETAILS

California's plan is to build an electric train that will connect Los Angeles with the Central Valley and then San Francisco in two hours and 40 minutes.

MORE DETAILS

High-speed rail is creating jobs and stimulating California's economy, but that's only part of the story. There are currently over 30 active construction sites spanning 119 miles from north of Fresno to north of Bakersfield, and the 3,700 foot Cedar Viaduct was completed this summer.

MORE DETAILS

The plan to build a high-speed train that will connect Las Vegas with Southern California took another important step this month. The massive transportation project by Brightline could begin as soon as this year, with an estimated completion plotted for around 2027.

MORE DETAILS

It'll be 100% electrified. It will use renewable power. It will literally be, not an embellishment, the greenest train in the world. Given that no major high-speed railway is fully powered by renewables currently, that may be true if the $12 billion Brightline West project opens on schedule by 2028.

MORE DETAILS

A lot cheaper. That high-speed train ticket would cost about $75, compared to more than $200 to fly or drive. Ready to ride?

MORE DETAILS

This high speed train could be the first to be powered entirely by renewable energy. California's long-awaited high speed train will be solar powered, according to the California High-Speed Rail Authority. It's been a rocky road so far for the California High-Speed Rail Authority's promising new project.

MORE DETAILS

Calvin Yang. Indonesia's high-speed railway, a delayed multibillion-dollar project backed by China, is unlikely to be profitable, said observers, citing the line's far-out station locations and the high maintenance costs expected in future.

MORE DETAILS

It Won't Help and May Hurt the Economy. Studies have found that high-?speed trains can generate new economic development near the stations where the trains stop. However, the same studies show that economic development slows in communities not served by such trains.

MORE DETAILS

High-speed train revolution China has built around 26,000 miles (42,000 kilometers) of dedicated high-speed railways since 2008 and plans to top 43,000 miles (70,000 kilometers) by 2035. Meanwhile, the United States has just 375 route-miles of track cleared for operation at more than 100 mph.

MORE DETAILS

That works out to $200 million a mile for hilly areas. At these costs, Obama's original high-?speed rail plan would require well over $1 trillion, while the USHSR's plan would need well over $3 trillion. Building a system longer than China's would cost at least $4 trillion.

MORE DETAILS

The new Acela will operate at top speeds of 160 mph vs. today's fleet, which operates at top speeds of 150 mph. Amtrak's new Acela fleet is scheduled to enter service on the NEC in 2024.

MORE DETAILS

In 2008 when voters approved the bond measure for the train, the cost to connect the 500-mile span would be around $33 billion. Today, the whole 500-mile system would cost a grand total of $128 billion. That price tag has left state officials scratching their heads to bridge that $100 billion funding gap.

MORE DETAILS

Per mile, the New York project cost $2.6 billion, which is high even by U.S. standards. For example, the Purple Line in Los Angeles cost $800 million per mile.