The Sumner Tunnel was opened on June 30, 1934.It carried traffic in both directions until the opening of the parallel Callahan Tunnel in 1961. The Sumner Tunnel is named for William H. Sumner, the son of Governor Increase Sumner.
It was originally a two-way road that carried traffic in both directions, until the opening of the parallel Callahan Tunnel in 1961. The tunnel is 8,448 feet long, of which approximately 3,960 feet are underwater. In 2017, the state removed the tollbooths as part of a switch to electronic tolling.
It carries motor vehicles from the North End to Logan International Airport and Route 1A in East Boston. Ordinarily, this tunnel is only used to carry traffic out of the city, and with the completion of the Big Dig it only collects traffic from I-93 southbound and downtown Boston.
Opened to traffic June 30, 1934. It was originally a two-way road that carried traffic in both directions, until the opening of the parallel Callahan Tunnel in 1961. The tunnel is 8,448 feet long, of which approximately 3,960 feet are underwater.
Since the Sumner Tunnel runs one way from Logan Airport to the North End, getting to the airport during the tunnel closure is not as challenging as getting from the airport. Most traffic will be detoured into the Ted Williams Tunnel and onto the Tobin Bridge to connect with Interstate 93.
First, workers dredged a 50-foot trench along the floor of Boston Harbor. Then, 12 giant steel tubes, each 325 feet long and already containing roads, were dropped into the water. Once the tubes had been connected on the harbor floor, the tunnel was buried in a 5-foot protective layer of rock.
On July 10, 2006, concrete ceiling panels and debris weighing 26 short tons (24 tonnes) and measuring 20 by 40 ft (6.1 by 12.2 m) fell on a car traveling on the two-lane ramp connecting northbound I-93 to eastbound I-90 in South Boston, killing Milena Del Valle, who was a passenger, and injuring her husband, Angel Del ...
The National Transportation Safety Board determines that the probable cause of the July 10, 2006, ceiling collapse in the D Street portal of the Interstate 90 connector tunnel in Boston, Massachusetts, was the use of an epoxy anchor adhesive with poor creep resistance, that is, an epoxy formulation that was not capable ...
What state is Sumner Tunnel SR-1A in? This toll is in Massachusetts. Which transponder can be used on Sumner Tunnel SR-1A? Only E-ZPass is supported for Sumner Tunnel SR-1A.
The Ted Williams Tunnel interface in East Boston between the land-based approach and the underwater section is 90 feet below the surface of Boston Harbor, the deepest such connection in North America.