Notes GhostRider was closed from September 8th, 2015 to June, 2016 for a refurbishment performed by GCI. During the refurbishment, the ride was re-tracked, some sections were re-profiled and the original three PTC trains were replaced by two GCI's Millennium Flyer trains.