Moreover, the station floor was completely redone. The old floor made out of laminated plywood sheets was replaced with fresh, sturdy wooden planks. After Labor Day 2022, Grizzly closed for major refurbishment by The Gravity Group. 1,040 feet of the ride was retracked to provide a smoother ride experience.