The Sumner Tunnel was opened on June 30, 1934.It carried traffic in both directions until the opening of the parallel Callahan Tunnel in 1961. The Sumner Tunnel is named for William H. Sumner, the son of Governor Increase Sumner.
Built in the 1930s, the Sumner Tunnel (Route 1A South) is the first traffic tunnel in Massachusetts and takes vehicles from Logan Airport to Boston/I-93.
The tunnel is 8,448 feet (2,575 m) long, of which approximately 3,960 feet (1,210 m) are underwater. A toll is collected in both directions, through the E-ZPass electronic toll collection system, formerly named the Fast Lane system.
It was originally a two-way road that carried traffic in both directions, until the opening of the parallel Callahan Tunnel in 1961. The tunnel is 8,448 feet long, of which approximately 3,960 feet are underwater. In 2017, the state removed the tollbooths as part of a switch to electronic tolling.
The Ted Williams Tunnel interface in East Boston between the land-based approach and the underwater section is 90 feet below the surface of Boston Harbor, the deepest such connection in North America. The project's seven-building ventilation system is one of the largest highway tunnel ventilation systems in the world.
The Sumner Tunnel is a road tunnel in Boston, Massachusetts, United States. It carries traffic under Boston Harbor in one direction, from Logan International Airport and Route 1A in East Boston.
Opened to traffic June 30, 1934. It was originally a two-way road that carried traffic in both directions, until the opening of the parallel Callahan Tunnel in 1961. The tunnel is 8,448 feet long, of which approximately 3,960 feet are underwater.
The Sumner Tunnel is a road tunnel in Boston, Massachusetts, United States. It carries traffic under Boston Harbor in one direction, from Logan International Airport and Route 1A in East Boston.
The tunnel was constructed to handle automobile traffic from the North End of Boston to East Boston. The tunnel opened in 1935. Also included are three parcel maps with corresponding lists of property taken for “Haymarket Square Improvement.”
Necessary repairs and permanent resiliency improvements are being implemented at the Holland Tunnel as part of the Holland Tunnel Sandy Repairs and Resiliency Improvements project. To accommodate this work, overnight closures will be required, Sunday through Friday, until the end of 2025.
What state is Sumner Tunnel SR-1A in? This toll is in Massachusetts. Which transponder can be used on Sumner Tunnel SR-1A? Only E-ZPass is supported for Sumner Tunnel SR-1A.